EDGARDO A. MANUEL
330W 223rd st. APT12, Carson, CA 90745
Home: 310-533-9523 - Cell: 310-782-4978 - eamanuel4@yahoo.com
PROFESSIONAL SUMMARY
Wireless Telecoms Professional dedicated to continuous process improvement in the
face of rapidly evolving and changing markets. Extremely results-oriented and
proactive in addressing and resolving problems. Motivated and highly effective at
finding the best methods possible to complete exceptional construction projects. Strong
knowledge of RF principles and concepts, experience on electrical installation,
operation and mantenance.
WORK HISTORY
07/2013 to 01/2015 Construction Manager - New Site Build (scoping)
Overland Contracting Inc. – 12750 Center court drive, suite 600 Cerritos, CA 90703
· Reviewed construction drawings and details making sure all the necessary
information and details are clearly stated in the plans.
· Prepared documents, construction drawings, RFDS, Power and TELCO design,
tower drawings and other documents prior to schedule a site bid walk with the
contractors.
· Developed detailed material take offs and scope of services list from RF design
and Engineered drawing.
· Reviewed contractor's change orders validity prior in submitting to AT&T.
· Reviewed a True-up documents submitted by contractors for final submission to
NORAD.
· Report project status and performance data as required to management.
09/2012 to 07/2013 Construction Manager - UMTS
Overland Contracting Inc. – 12750 Center court drive, suite 600, Cerritos, CA 90703
· Provided support to field construction manager needed to quickly resolve issues
preventing integration and sites going On Air with updates on gating issues.
· Provided reports to upper management summarizing the procedures followed and
results of the troubleshooting process.
· Coordinated with the contractors to revisit sites for further troubleshooting if
needed.
· Attended and provided weekly progress report of the sites that has a existing war
room issues to AT&T during weekly call conference.
· Coordinated with AT&T logistic of the availabilities of spare equipment’s, parts
needed for alarm clearing.
· Ordered spare equipments to Talley communications if parts is not available with
AT&T.
· Prepared OEM equipment order process and Feed sheet completions base on RF
design sheet.
05/2009 to 08/2012 Telecoms Engineer
Atlas wireless – Florida, USA
· Commissioning, integration of various Ericsson equipment for UMTS
technology.
· GSM channel re-configuration.
· Performed site survey of existing equipment and configuration installed at site.
· Troubleshooting and alarm clearing of UMTS including RSSI issue.
· Provided technical reports and all aspect of task performed during site visit to
supervisor.
05/2008 to 04/2009 Telecoms Engineer
Glotel Telecoms – Chicago, USA
· Commissioning and integration of GSM technology.
· Downgrading and upgrading of GSM 850 & 1900.
· Assisted Antenna crew on TMA installation and activation as per RF design.
· Troubleshooting of various alarms on GSM technology.
· Antenna tilt adjustment.
· Performed T1 testing.
07/2005 to 05/2008 Telecoms Engineer
Dataworkforce – Dallas, TX
· Performed re-grooming of Ericsson GSM (2102/2106/2206 cabinet
reconfiguration) prior to UMTS combo installation.
· Installed various Ericsson equipment, 3106, 3206, 3018 etc.
08/1995 to 07/2005 Senior ENGINEER
SMART COMMUNICATIONS INC. – Manila, Philippines
· Performed change out of Nokia to Ericsson technology.
· Performed dual banding of Ericsson.
· Integration and commissioning of Ericsson and GSM technology.
· Performed drive test on per sector handover.
· Performed RF planning and optimization based on RF design.
· Work with RF design to ensure a smooth and seamless integration of new sites.
· Participated in site technical visit to identify RF equipment locations and antenna
orientation.
· Performed Engineering related technical analysis.
· Modify parameters for GSM and UMTS based on design t ensure network
optimization.
· Generate RF engineering reports as required.
· Prepare report and recommendation to project manager for network updates.
1992 to 1994
Electrical Engineer 1
Morning star Milling Company – Manila, Philippines
· Conducting preventive and maintenance of various electrical equipment.
· Installing of new electrical equipments.
· Troubleshooting of different electrical circuit.
· Provides technical reports and recommendarions to manager.
1991 to 1992
Electrician / Draftsman
Romago – Manila, Philippines
· Installing electrical layout based on electrical blue print..
· Performed planning and estimate.
· Drafting of electrical lay-out for changes and modifications.
· Provide technical reports and recommendations to project engineer.
EDUCATION
Bachelor of Science in Electrical Engineering
Technological Institute of the Philippines - Manila, Philippines